“Progress in bringing the equipment back online has been slower than expected given frequent curtailments and hardware failures due to power surges,” the Toronto-based firm mentioned on Friday. “As individual miner hashboards are repaired and re-installed, other hashboards are failing and require repair, which is impairing our hashrate and production.”
Crypto Miner Hut 8 (HUT) Says Repairs to Damaged Equipment at Alberta Site Are Taking Longer Than Expected
-